Mr. Kienlen has over 20 years of experience in California water resources engineering. He has prepared water right applications and change petitions together with associated maps and related documentation for various project types and sizes. He has also prepared and reviewed Water Availability Analysis required by the Division of Water Rights for obtaining water right permits. Mr. Kienlen has provided support for numerous water transfer agreements and programs. Additionally, he has experience surveying Delta Islands, including the identification of all facilities and inspection of physical characteristics affecting the integrity of the levee system. Preparation of reports for submittal to FEMA. Gather, establish, and document data during and after flood events for the purpose of determining flows, water surface elevations, and the extent of the associated flooding. Evaluation of methods and costs associated with flood events.